How to Write a Project Brief That Gets You an Accurate Estimate
Open with the reason this software should exist, not your preferred technology. What kind of user will use this, vuejs web development how often, and what happens today? An experienced team who grasps the purpose will suggest a cheaper route to it; a team that receives only a list of screens will price the list as written.
Describe the scope as concrete flows: a walk through each important path. Every bit as useful, write down what you are not building. A written out-of-scope list removes more friction during acceptance than any other single page. Indicate as well which decisions are settled and which may still change — honest teams price those differently, and hiding it helps nobody.
Write down the hard constraints. This means existing systems the software has to talk to, the data you have and where it lives, compliance requirements, user volumes, supported browsers or docker consulting services devices and stacks you cannot change. Where a date is genuinely fixed, say why: an experienced team is usually able to rearrange the plan to meet it, but not if the date is a secret.
Say what completion means for the important items. Clear acceptance criteria need not use special syntax: a plain-language note setting out the expected behaviour is enough. That one addition compresses the review at the end by a surprising margin and symfony vs laravel removes most late-stage disagreement.
One last thing, state what you want in the response. Require a task-level breakdown, the assumptions behind each number, the main risks and an optimistic and a pessimistic figure. Take a broad range as information, not evasion: it usually points to the part of the brief that needs work. At that point clarify that area and ask again — the next version is the one worth planning around.